Glad to be working on this exciting project!
As we close out the year at Poet Hill Residences in Worcester, MA. Callahan Construction Managers Construction has reached the roof in Block D; Is framing the walls on Flr 5 in Block C; 3rd Floor trusses in Block B; and starting the walls on the deck of Block A. H.B. Fleming, Inc. is removing the last of the rakers of the SOE, and the MEPS subs are roughing in both levels of the garages. Well Done team, and we look forward to an incredible 2025. SMC Management Corp.; Maugel DeStefano Architects; TFMoran; Studio59east; https://lnkd.in/e3MpxENy