Hapa Collaborative reposted this
🌊 Framing Success: Guichon Creek Daylighting - A Commitment to Resilience and Restoration 🌊 When a sinkhole formed on the BCIT campus, it wasn’t just an infrastructure challenge - it was an opportunity for innovation. Located in an urban area, BCIT is underlain by Guichon Creek, which has been culverted underground for decades. The latest sinkhole, directly above the creek, prompted a bold response: replace the failing culvert with a daylit creek and fishway. BCIT assembled a multidisciplinary team, including KWL, McElhanney, PCL Construction, Hapa Collaborative, and B&B Contracting Group, to bring this vision to life. Leveraging years of experience with the Guichon Creek system and campus-wide Stormwater Drainage Strategy, KWL led the creek daylighting design, retrofitting an existing weir that had blocked fish passage for nearly 60 years. This innovative solution not only addressed the immediate infrastructure failure, but also demonstrated BCIT’s commitment to climate resilience. By integrating natural assets, the project improved flood capacity while enhancing the campus ecosystem. And the results? Fish have now been spotted above the weir for the first time in decades! This is more than a daylighting project - it’s a testament to what’s possible when sustainability and collaboration come together. #GuichonCreek #BCIT #ClimateResilience #InfrastructureInnovation #Daylighting #SustainableEngineering #FishPassage