𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐇𝐢𝐠𝐡𝐥𝐢𝐠𝐡𝐭: 𝐒𝐩𝐫𝐢𝐧𝐠𝐰𝐞𝐥𝐥 𝐒𝐞𝐫𝐯𝐢𝐜𝐞 𝐑𝐞𝐬𝐞𝐫𝐯𝐨𝐢𝐫 🌊
We’re proud to have played a pivotal role in the construction of the 𝐒𝐩𝐫𝐢𝐧𝐠𝐰𝐞𝐥𝐥 𝐒𝐞𝐫𝐯𝐢𝐜𝐞 𝐑𝐞𝐬𝐞𝐫𝐯𝐨𝐢𝐫, a key project for Northumbrian Water to improve water resilience for South Tyneside and Wearside.
This 43ML semi-precast reservoir, located near Washington, Tyne and Wear, will benefit over 50,000 properties directly and provide resilience for a further 200,000 properties across the region.
At FLI Precast Solutions, our team was engaged early in the project by Mott MacDonald Bentley (MMB) to deliver a semi-precast concrete solution designed for durability, efficiency, and quality.
Our Contribution
✅ 𝐏𝐫𝐞𝐜𝐚𝐬𝐭 𝐖𝐚𝐥𝐥 𝐏𝐚𝐧𝐞𝐥𝐬: Manufactured off-site to improve quality control and reduce on-site disruption.
✅ 𝐏𝐫𝐞𝐜𝐢𝐬𝐢𝐨𝐧 𝐃𝐞𝐬𝐢𝐠𝐧: Collaborative design integration to ensure the structural integrity of this large-scale reservoir.
✅ 𝐓𝐢𝐦𝐞 & 𝐂𝐚𝐫𝐛𝐨𝐧 𝐄𝐟𝐟𝐢𝐜𝐢𝐞𝐧𝐜𝐲: Off-site manufacturing and installation reduced project timelines while optimising environmental benefits.
By partnering early with the project team, we delivered solutions that streamlined the construction process and aligned with the project's goals for quality and sustainability.
This reservoir is a prime example of how collaboration, innovative methods, and precision engineering can create infrastructure that makes a lasting difference.
👏 A huge thank you to Northumbrian Water, MMB, and all stakeholders involved in this essential project.
#FLIPrecast #ProjectHighlight #SpringwellReservoir #WaterResilience #Collaboration #InnovativeEngineering #SustainableConstruction #WaterSector