Shandong Boyoun Heavy Industries Co., Ltd.

Shandong Boyoun Heavy Industries Co., Ltd.

建筑业

Binzhou,Shandong 1,032 位关注者

Manufacturer of formwork for bridge, viaduct, and tunnel.

关于我们

Boyoun Heavy Industries Co., Ltd was founded in 2006, as one leading National High-Tech Enterprise that specializes in supplying a wide range types of formwork for bridge, viaduct and tunnel engineering. The headquarter and main factory are located in Binzhou city of Shandong province, with International Department located in Beijing.  Main products cover: Precast Box Girder Mould, Cantilever Form Traveller, I/T/U Girder Formwork, Tunnel Lining Trolley, Pier Formwork, etc. Besides supplying the formwork, Boyoun has been committed to delivering turn-key projects and offering customized services including technical proposals, on-site guidance, buy-back and rental services.  Boyoun has 4 rental bases are under running all over China now to meet rental requirements of reused infrastructural material. Rental material can be delivered to major areas of the China within 15-day, which helps customers save 30%-50% of the dominant cost directly. The market share of the company's core products-Balanced Cantilever has been at top level for years, over 60% in domestic market. The comprehensive capacity is over 100,000 tons of construction materials and formwork. Boyoun participates in the standard setting for the national industry.  We have established good cooperative relationship with hundreds of infrastructure enterprises, such as China Railway Group, China Railway Construction Group, China State Construction, China Communications Construction, Sinohydro Group, China Coal, Power China and Energy China, typical leading enterprises in infrastructure construction in China. Boyoun has delivered plenty of projects outside China, including China Maldives Friendship Bridge, Pakistan Karlot Hydro Power Station, Kuala Lumpur MRT Phase II Project and LRT Project, Padma Bridge  in Bangladesh, Pulau Balang Cable Stayed Bridge in Indonesia, Eastern Malaysia Railway, MRT 2 and LRT 3 in Malaysia, BGC-Ortigas BGC-Ortigas Bridge in Philippines, No.6 Expressway in Thailand, etc.

网站
https://www.boyoun.cn/
所属行业
建筑业
规模
201-500 人
总部
Binzhou,Shandong
类型
私人持股
创立
2006

地点

  • 主要

    CN,Shandong,Binzhou,256659

    获取路线
  • No. 58 Xinhuaxijie

    2211-2212 Building C, Wanda Plaza, Tongzhou Disctrict

    CN,Beijing,Beijing City,101118

    获取路线

Shandong Boyoun Heavy Industries Co., Ltd.员工

动态

  • 🚀 The Successful Closure of Tao'er River Grand Bridge, the World's Longest-Span Hybrid Girder Bridge. On December 29th, we witnessed double celebrations in Binzhou! The 50,000-ton-level navigation channel project at Binzhou Port kicked off, and the G228 Dandong Line Binzhou Section Taoer River Mega Bridge was successfully completed! 🎉 The Taoer River Mega Bridge is a vital part of the local highway project. At 4,334 meters long, with its main span being a 128+338+128m hybrid beam continuous rigid frame bridge (double lanes), it's set to be crowned as the world's longest-span hybrid beam bridge once fully finished! 😎 Boyoun supplied over 2,500 tons of construction equipment, including form travelers to hydraulic systems. Their form traveler is truly a wonder, integrating various construction methods and powering through every section of the bridge building process. 💪 Let's spotlight the amazing features of Boyoun's form traveler: 👉 The compatibility between form traveler components and supports slashes the project's material cost! 📉 👉 Given the heavyweight of the cantilever casting and steel box girder parts, they beefed up the local structure using high-strength Q355 material for perfect strength and stiffness. 🏋️ 👉 The dual-track intelligent synchronous walking system? It enables real-time monitoring and instant corrections while on the move! 📈 👉 Before shipping, laser cutting, pre-assembly, and pull tests on major parts prevent future headaches. ✅ 👉 And Boyoun's continuous pro services? On-site guidance and regular safety checks ensure smooth, cost-effective construction for clients. 👷 The bridge's closure is a huge milestone! Crossing the river now takes just 5 minutes instead of 90! This is a game-changer for promoting the Bohai Economic Rim's integration, fueling the new & old growth driver shift in the region, and backing ecological protection and quality growth along the Yellow River Basin. 🌳 More details: 👉 [Read the full article here https://bit.ly/4fJbyBI] and share your thoughts in the comments below! Looking ahead, Boyoun is all about innovation-driven high-quality development, digging deeper into customer needs, and beefing up their value-added services. Here's to more amazing feats together! 🌈 #TaoerRiverMegaBridge #Construction #Innovation 

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • 🌟❄️The Winter Solstice has arrived! It's the day with the shortest daylight and longest night in the Northern Hemisphere. This ancient festival holds deep significance. It marks a pivotal moment in nature's cycle, where the darkest night gives hope for the return of longer days and the coming of spring. 🌱 Families often gather to enjoy delicious traditional foods like dumplings. It's a time for warmth, love, and togetherness. Let's embrace this special occasion, feel the chill in the air, and look forward to the renewal that follows. Happy Winter Solstice! 🥟💖 

    • 该图片无替代文字
  • This Winter Solstice at Boyoun was truly unforgettable! 🥟 In the dumpling-making area, it was super lively! We kneaded the dough, prepared the fillings, rolled out the wrappers and wrapped the dumplings in perfect harmony. 💪 While our hands were busy, our mouths were not idle either. We shared interesting stories from life and work, and the laughter filled the air. 😄 Look at those dumplings we made! Some were like gold ingots, wishing for wealth, and some were like lucky pouches, bringing good fortune. 💰 Soon, the tables were filled with neatly arranged dumplings, just waiting to be cooked and bring more joy. And there was also a fun "DIY Candied Hawthorns" part. We made the syrup ourselves and carefully coated the fruits. When the sweet and sour candied hawthorns were ready, the sweet smell made us feel like we were back to our happy childhood. 🍭 It really pushed the joyful atmosphere to the peak! After the dumplings were cooked, we gathered to taste our own hard work. Each bite was not only delicious but also full of the warmth of unity and friendship. 💕 Although it was cold outside, in Boyoun, we were surrounded by the warmth like spring. Food, laughter, and gatherings made this Winter Solstice unforgettable. 🥰  #Winter_Solstice #Warmth_In_Winter #Traditional_Festival

  • 🚀Large-size segment box girder's transportation and hoisting challenges have long been a hurdle. We introduce the large-cantilever segment prefabricated composite-section spine beam concept. It divides the box girder into "core segment box girder" and "prefabricated cantilever", with research on its structure, connections, and prestressing system. From sectional design to connection methods and prestressing, we're paving the way for better wide-span bridges. 🏗️ 📣 Take Action: Join the conversation and share this article with your fellow engineers and bridge enthusiasts! Let's support innovation and push the boundaries of what's possible in bridge construction. 👉 [Read the full article here https://bit.ly/3Bpf468] and share your thoughts in the comments below! #Bridge_Construction #Innovation #Engineering #Prefabrication #Concrete #Construction #Technology #Bridge_Design #Infrastructure #Share_The_Knowledge

    • 该图片无替代文字
    • 该图片无替代文字
  • 🌉✨ Some Sharing on Cantilever Form Traveler Design! 🌉✨ When it comes to designing this essential component, the first hurdle is determining the segmented length of the cantilever casting. Long segments speed up construction but demand larger equipment, while short ones mean more work yet smaller gear. Usually, it's around 3- 5m, with a max of 8m. 📏 The cross-section also matters! For wide bridges (over 15m) with double or multi-box structures, two form travelers might be the way to go for added flexibility. 🌉 The overall design concept is a multi-faceted gem. We aim to reduce self-weight with smart choices like high-strength, lightweight steel and clever structural designs. 💪 Hydraulic and screw jacks, along with centralized control, cut down construction time and labor. The formwork is both stiff and durable, ensuring top-notch concrete quality. 🚧 And don't forget a comfy workspace with a sunshade and rain shelter! ☂️ Plus, it's adaptable to different box girders. Load calculations are a big deal too! We've got specific coefficients for different scenarios and a detailed breakdown of all the loads. 📈 Different load combinations are used for strength, stability, deformation, and movement checks. In a nutshell, an optimized cantilever form traveler design is the key to building amazing bridges. It's a complex dance of factors, but when done right, it speeds up construction, boosts quality, and keeps everyone safe. 👏 🔗 [Link to further reading or resources: https://bit.ly/41l60d5] 🌐🌉 #Bridge_Construction #Cantilever_Form_Traveler  

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • 🌉🚗 Bridge Expansion Joints: Ensuring Smooth Travel & Structural Integrity 🛣️🔧 Ever wondered how bridges can withstand extreme temperatures, heavy traffic, and even earthquakes without crumbling? The answer lies in the clever design of bridge expansion joints! Let's dive into the science and understand their importance: 🔹 **The Basics of Bridge Movement:** Bridges are subjected to various forces that can cause them to expand or contract. Temperature changes, especially, can cause significant movement as materials like steel and concrete expand and contract. 🔹 **The Role of Expansion Joints:** These joints are designed to accommodate these movements. They allow the bridge to bend, twist, and move without causing stress or damage to the structure. 🔹 **Types of Expansion Joints:** - modular expansion joint - steel expansion joint  - corrugated expansion joint  - single-joint expansion joint  - carbon seamless expansion joint 🔹 **Why They're Essential:** - **Prevent Structural Damage:** By allowing for natural expansion and contraction, they prevent stress that can lead to cracks or collapses. - **Ensure Safety:** They maintain the integrity of the bridge, ensuring it remains safe for all users. 🔬 **Join the Conversation!** Comment below with your questions about bridge expansion joints or share your experience with a bridge that you think has exceptional expansion joint design! 🔗 [Link to further reading or resources: https://bit.ly/4fVA3wv] 🌐🌉 🌉 Stay curious and keep bridges safe! 🌟😊

    • 该图片无替代文字
  • 🎉Great News! The #Saribas_Bridge in Malaysia has reached a significant milestone! 🌟 The main bridge was successfully closed at 8 pm on November 25th, as the final batch of concrete was poured into the formwork. This marks the final sprint of the project, hastening its completion and opening to traffic. 🚧 Located in Pusa Town, Betong Division, Sarawak, Malaysia, this 1,550-meter-long bridge with a 200-meter maximum span of the main bridge features a combined structure of continuous rigid frame and continuous beam. The continuous rigid frame is a cast-in-place prestressed concrete box girder with unique characteristics. 🌉 The construction wasn't easy. Challenges like driving large-diameter and long steel pipe piles in water, building high-pile caps with prefabricated concrete bottom cofferdams on water, and asymmetric cantilever construction with large spans, along with extremely complex construction environment due to irregular tidal changes (a maximum tidal range of over 5 meters) made it highly difficult. But our project team was up to the task! They strictly followed quality control requirements, monitored every step from raw material inspection to technical scheme demonstration and construction dynamic monitoring. And thanks to effective organization, the engineering quality and construction schedule progressed smoothly. 👍 Boyoun on-site guidance for key nodes like the assembly and movement of cantilever form traveler and carried out all-round and whole-process supervision. The professional services earned them high praise and honorary certificates. 👏 Upon opening, this bridge will boost regional integration and economic and social development in the area. In the context of the "Belt and Road Initiative", it will surely become a remarkable business card for "Overseas Boyoun". We can't wait to see this bridge fully operational and making a positive impact! 🇲🇾💪 Know more details 👉 https://bit.ly/4fOY08w communicate with us 👉 https://lnkd.in/giKcdRVf

    • 该图片无替代文字
    • 该图片无替代文字
  • 📢 Here's the update on the North Riverside High-Speed Railway Project in China: 📍 Location & Structure: - The continuous beam across S229 in Taixing, North Riverside High-Speed Railway Package 9, is situated in Taizhou City, Jiangsu Province.  - It features a prestressed concrete continuous beam with a span of 72 +128+72m and a single-cell box structure. 🚧 Construction Method: - The construction is carried out by suspension casting with cantilever form travelers and bridge fabrication machines. 💪 Material Supply by Boyoun: - Boyoun has supplied a total of 968 tons of construction materials for the entire package.  - These materials are used in continuous beams with different spans, such as 128m, 100m, and 48m. 📈 Project Progress: - Some of the continuous beams have already been closed. 🌟 Boyoun's Contribution: - Boyoun's professional and continuous on-site services have ensured the smooth progress of the project.  - Their excellent work has been highly recognized and they received a commendation letter. 🚄 Significance of the Railway: - The North Riverside High-Speed Railway is a crucial part of the China "Eight Vertical and Eight Horizontal" high-speed railway network.  - After completion and opening, the travel time from Taixing to Shanghai will be reduced to within an hour, which will have a significant impact on optimizing Taixing's traffic layout and promoting regional economic development. #China #High_Speed_Railway

相似主页