Behind us is the company Christmas Eve, which was attended by our 50-member team 🎄. There was a truly festive atmosphere - feasting together, delicious food and lots of smiles. Our presidents, Tomasz Kusznierewicz and Piotr Ossowski (pictured), received gifts from the employees as an expression of gratitude 😊. We would like to thank the entire staff for their commitment and hard work in the past year. We wish you peaceful and joyful holidays. We also extend our best wishes to our customers - may this time bring you lots of warmth and good moments!
About us
- Website
-
www.optem.pl
External link for Optem Global
- Industry
- Construction
Updates
-
In the video you can see the completion of work on DK20 - Szczecinek Bypass. As part of the project, we made an overhead WE-3 animal crossing and retaining walls. We used our proprietary technologies: 🔷 optemARCH - prefabricated reinforced concrete arch elements, which speed up construction and ensure durability and aesthetics of the structure. 🔷 optemPANEL - a system for the construction of retaining walls, which, thanks to large panels and durable geopasses, allows for the efficient construction of embankment reinforcement. Thanks to these solutions, the work went smoothly, and the results are durable and do not require complicated maintenance. #optemARCH #optemPANEL #Optem #construction
-
At the construction site of the Siedlin - Załuski section (section 1), we are not only installing prefabricated elements, but also working on locks and tethers. ➡️ Locks are special joints that provide permanent and stable connection of prefabricated elements. ➡️ Tensioning involves reinforcing and concreting the joints between elements to create a solid structure capable of carrying loads. The photos show the successive stages of work on this section. 📸 #SiedlinZaluski #prefabrication #prefabrication #roadbuilding #infrastructure #Optem
-
The reinforcement in the optemPANEL system (realization of the S3 section Dargobądź - Troszyn) uses strong geopasses that transfer tensile stresses and cooperate with the soil. This results in the stability of the embankment and the durability of the retaining wall even in difficult ground conditions. If you are planning to build retaining walls that stand out for their aesthetics, durability and quick installation, optemPANEL is a proven choice. Contact us for more details! 📩 #S3 #optemPANEL #masonry #building #infrastructure #stabilitygrun
-
🚧 Fast-track installation on Ruda BUGAJ 🚧. At the beginning of September 2024, work began on the new section of Ruda BUGAJ, implemented under the “design and build” formula. We are responsible for both design and construction. We like to be responsible for the project from start to finish, so our designers can optimize assumptions and ensure maximum efficiency. Just one month after entering the site, we installed the optemFRAME structure. With full prefabrication - including prefabricated piles, the optemFRAME facility and the optemBLOK retaining wall system - the project is scheduled for completion by the end of November 2024. Why is optemFRAME prefabrication the ideal solution? ➡️ Fast installation and time savings, ➡️ Reduced labor costs through efficient processes, ➡️ Optimized designs that combine functionality with durability. In the photos you can see: 1. Piling of foundations 2. Construction of supports 3 and 4 Assembling the structure 5 and 6 Erection of retaining walls #optemFRAME #S6 #prefabrication #engineering #designandbuild #resistivewalls
-
+1
-
Did you know that today is World Record Breaking Day? 📅 On this occasion, it's worth mentioning our records! The 14.7m high retaining walls we designed on the Auschwitz bypass are truly impressive structures, especially compared to the standards in engineering.Thanks to our experience, knowledge and proven materials, we are able to realize such high walls, as well as even higher ones. The entire process is in our hands - from the design, to the quotation, to the delivery of reinforced soil retaining walls. Our Geotechnical Laboratory takes care of all stages: from concept, construction and detailed design, to technological and replacement designs, tailored to the client's needs. #breakingrekordsday #resistivewalls #cimbypass #geotechnics #engineering #records #engineeringdesign
-
Those who have been closely following our activities could observe the successive stages of construction of the footbridge in the Krępsko village. Now it is ready and waiting for pedestrians and cyclists, connecting the banks and being an important part of this section of 🚶♀️🚴♂️. Due to the difficult geological conditions, we used steel sheet piling to effectively secure and dewater the excavation. Once this work was completed, we proceeded to build the footbridge structure. What are the characteristics of our footbridges? ✔️ Light weight, which facilitates transportation and installation ✔️ Speed of installation ✔️ Reduction in labor costs - simpler installation means less labor These solutions have made the footbridge in Krępsko Village both durable and quick to build, and its maintenance remains economical. #overbridge #compositeoverlay #Krępsko #Optem
-
Today we have an update for you from the construction of a collision-free road connection between Kolejowa Street and 1-go Maja Street in Bukowno 🚧. The project involves the construction of retaining walls with an impressive height of up to 12.5 meters, which we are building using the optemBLOK system - perfect for such projects. 🔷 The use of optemBLOK significantly speeds up the pace of work thanks to quick assembly. The blocks are light enough to be laid by hand, reducing the need for heavy equipment, lowering costs and facilitating work on difficult terrain. 🔷 The advantage of this system is the drainage channels, which effectively drain water, protecting the walls from moisture and extending their life. This is important for the safety and long-term stability of the structure. 🔷 The optemBLOK system allows for simple shaping of retaining structures in an arc. #optemBLOK #resistivewalls #engineering #roadconstruction #optem #Bukowno
-
Yes! Reinforced soil retaining walls are widely used in civil engineering, especially where there is no space for a slope with a safe slope or as an alternative to monolithic walls. In the optemBLOK system, geosynthetics reinforce the soil, transferring stresses and providing stability, while prefabricated blocks protect against erosion and give an aesthetic appearance. Thanks to its simple installation, without the need for heavy equipment, the system allows walls of various shapes to be built quickly, making it competitive with traditional reinforced concrete walls in terms of cost and construction time. – Tomasz Kusznierewicz, CEO of OPTEM #Optem #resistivemasonry #optemBLOK #geosynetics #prefabrication
-
From July to September 2024, we served as general contractor on the construction of a bridge over the Bzura River. The work included the construction of reinforced concrete end supports and steel intermediate supports, which ensured the stability of the entire structure. The load-bearing part of the structure was made of steel, which guaranteed the durability and strength of the bridge. The most important moment of the project was the transportation and installation of the steel superstructure, which arrived at the construction site in one piece and was installed in one day. The entire construction process was completed within three months, thanks to efficient planning and an efficient construction team. 💪 You can admire the results in this early autumn entourage! 📷 #bzura #bridge #engineering #generalcontractor #prefabrication