Bringing a schematic design to construction is a multifaceted process that bridges the conceptual with the tangible, transforming ideas into physical structures. Using the recently opened Embassy Suites project in Irving, TX as a visual and narrative, we highlight the transformative process.
1. Schematic Design: We start with creative brainstorming to develop preliminary concepts, focusing on layouts and spatial planning.
2. Design Development: Following approval, we refine these ideas, detailing materials, structural systems, and building components.
3. Construction Documents: We produce detailed drawings and specifications that act as the project's legal blueprint, guiding contractors and serving as the basis for permits and bids.
4. Permitting: We secure all necessary local and state permits, ensuring compliance with zoning and building codes.
5. Construction Phase: Physical construction begins, with assistance from our architects, to ensure adherence to plans and address any challenges.
6. Post-Construction and Closeout: The final phase includes inspections, issue resolution, and handover, complete with all necessary documentation for operation and maintenance.
This streamlined overview captures the essence of transforming visionary designs into functional, tangible realities, emphasizing planning, collaboration, and quality assurance every step of the way.