Check out this project we recently completed in a refinery in the Midwest, where precision and innovation were key to setting two vertically stacked gas coolers in an exceptionally tight work environment. With just 2 inches of horizontal clearance to live equipment and only 1 inch of vertical clearance, the job required an advanced approach to overcome these constraints. Additionally, flanges on the bottom cooler prevented sufficient clearance to set both gas coolers together, as traditional methods would have run out of vertical space before the flanges cleared the concrete pedestals. To address these challenges, we developed a custom two-step solution. Leveraging a Mini-Jack Gantry system sourced from Lifting Gear Hire (LGH USA) Houston, we: *️⃣ Set the bottom cooler using a conventional suspended approach from the gantry's header beam. *️⃣ Designed and utilized custom beams and adapters, fabricated by REEB RIGGING LLC, to safely set the top cooler on top of the header beam. This innovative process not only ensured precise placement but also allowed the work to be completed two days ahead of schedule. By tailoring our approach to the unique constraints of the jobsite, we minimized risk, maximized efficiency, and delivered another successful project for our client. A big thank you to REEB RIGGING LLC for their exceptional support in fabricating the custom components and to LGH USA for supplying the Mini-Jack Gantry system. #slh #precision #crane #rigging #excellence #experts #oilandgas
-
+4