Murphy Pipeline Contractors

Murphy Pipeline Contractors

Utilities

Jacksonville, FL 21,549 followers

About us

Our purpose is to help cities add value to their water & sewer pipeline replacement work using methods that are less intrusive to the community during construction, expedite project schedules, provide new infrastructure with an ultra-long design life, and save tax dollars by reducing overall project costs. - Pre-chlorinated pipe bursting: 2-inch through 16-inch water distribution replacement in residential neighborhoods - Compression Fit HDPE pipe lining: 16-inch through 54-inch water transmission and sewer force main replacement - Slip lining: 2-inch through 54-inch water transmission and sewer force main replacement The team is led by President Andy Mayer, who is a native of England and worked for British Gas at a time when they were first developing pipe bursting and CompressionFit. He was instrumental in the development and advancement of both methods. With millions of feet of static pipe bursting and CompressionFit experience, Murphy Pipelines has received numerous awards including 2021, 2019, 2018, 2015, 2014, 2005, 2003 Trenchless Project of the Year, CSX Rail Performance & Safety Award, APWA Environmental Project of the Year and Underground Construction Technology Association Most Valuable Professional (Andy Mayer).

Website
https://www.murphypipelines.com/
Industry
Utilities
Company size
51-200 employees
Headquarters
Jacksonville, FL
Type
Privately Held
Specialties
Pre-chlorinated Pipe Bursting, HDPE Pipe Lining, Static Pipe Bursting, Slip Lining, Water Main Replacement, Sewer Force Main, Trenchless Technology, Trenchless, HDPE pipe, Compression Fit HDPE pipe lining, Trenchless Water Line, Pipe Bursting, Sliplining, Design Build, Pipeline, Civil Engineering, Infrastructure, Pipelines, Pipe bursting, Pipe Lining, and Design-Build

Locations

Employees at Murphy Pipeline Contractors

Updates

Affiliated pages

Similar pages