Your aerospace material supplier missed the deadline. How do you salvage your project timeline?
A delayed aerospace material supply can put your project at risk. To navigate this challenge:
How do you handle delays from suppliers? Share your strategies.
Your aerospace material supplier missed the deadline. How do you salvage your project timeline?
A delayed aerospace material supply can put your project at risk. To navigate this challenge:
How do you handle delays from suppliers? Share your strategies.
-
Generally, drawing up a detailed technical report about what I was involved with while the material(to be supplied to me)shipment was expected, helps, especially if a lot of relevant plots and graphics are inserted in the report.
Rate this article
More relevant reading
-
Aerospace EngineeringYou’re an Aerospace Engineer looking to build relationships with vendors. What’s the best way to get started?
-
Aircraft DesignHow do you optimize the inspection intervals and locations for fatigue critical components?
-
AviationWhat are the most effective ways to improve fatigue resistance in aircraft structures?
-
Automotive EngineeringHow do you apply load cases in stress analysis for automotive components?